1 Lump sum to clear and grub trees and brush adjacent to FESs 15 Cubic yards of imported fill 2521 Cubic yards removal and proper disposal of uncontaminated sediment. 596 Cubic yards removal and proper disposal of sediment contaminated with PAHs. 72 Cubic yards removal and replacement of Class 4 rip rap 45 Cubic yards removal and replacement of Class 3 rip rap 1 Each - Removal and replacement of 54-inch RCP FES 10 Linear feet - remove and replace one segment of 54-inch RCP storm sewer 1 Each - Removal and replacement of 33-inch RCP FES 10 Linear feet - removal and replacement of one segment of 33-inch RCP storm sewer 850 Square yards of erosion control blanket 7 Pounds of grass seed 150 Linear feet of silt fence Pond Maintenance at a Stormwater Pond including Removal of contaminated and uncontaminated sediment And replacing RCP Storm Pipe and Rip Rap
Bid Protests Not Available