Bahamas Power & Light BPL-RFP-1198/22 CONSTRUCTION OF MHPS 12.47kV SECONDARY SUBSTATION BUILDING - ABACO SCOPE OF SERVICES Site Walkabout – Wednesday, February 2nd, 2022 at 11:00 a.m. at MARSH HARBOUR POWER STATION, S. C. BOOTLE HIGHWAY All persons must have the correct PPE as per the following or they will not be allowed access to the site: Hard Hat Safety Shoes Safety Glasses Hi-visibility Vest The following stages describes in general, but does not limit the scope of the Services which the Contractor shall be required to perform: (a) Construct a concrete building of dimensions 46’-4’L x 24’-4” W x 12’ H as per drawing #4-07-102-1598 (b) Install 2 x double steel exit doors, three-hour fire rating, with frame 9’H x 8’W at center on both front and read walls as per drawing #4-07-102-1598. The doors shall be 4’ x 9’ each and outfitted with stainless steel heavy duty entry locks (~ASIN B085NBCCWT) with panic exit combination. The doors shall swing outward (c) Construct with 6’ x 2’ Grey Aluminum louvers with the top of the louver at a height of 9’ as per drawing #4-07-102-1598. These shall be of the Acoustical Louver type. (d) The floor to the ceiling height shall be 12 feet (See drawing #4-07-102-1598) (e) Interior ceiling lighting shall be 4 x 4” double strip LED light fixtures (f) The exterior finish shall be of ¾” cement plaster (g) The roof shall be Asphalt on 5/8” plywood sheeting on Ice and Water Shield and the color of the shingles should be Architectural Grey. (h) Hurricane straps must be on each rafter @ 24” O/C. (See drawing #4-07-102-1598) (i) The pitch of the roof shall be 12:5 (See drawing #4-07-102-1598) (j) The ceiling shall be of 1 Hr. fire rated sheet rock (k) The roof shall have galvanized drip strip, 1” x 8” Fascia Board, and ½” Plywood Boxing. (See drawing #4-07-102-1598) (l) The belt shall be constructed with 3” x 6” Wood Plate Bolted with 5/8” x 10“galvanized bolt @ 3’ – 0” O/C. It shall have 4 #5 rods tied with #2 stirrups @12” O/C in 8” x 12” (See drawing #4-07-102-1598) (m) The room shall be outfitted with one (1) electrical outlet per wall (n) 1- 2.5 Ton A/C unit shall be installed to maintain 78 degrees F in switching room: 240VAC electrical outlet shall be installed at a height of 7 feet and 3 feet from the southwest corner of the building The height of the A/C at the top shall 9 feet (in line with the louver) The Thermostat shall be mounted 2 feet to the left of the front entrance door at a height of 6 feet (o) A service position must be provided to facilitate 200A 1ph main disconnect (p) The open cable trench shall be covered with 4’ x 4’-3” metal covers to be set in ¼” vertical x ½” horizontal grooves around the 43’ x 4’ perimeter (see Detail E). (q) The building interior and exterior shall be painted with white masonry paint. All debris must be removed to the Public Dump Site. Please download the full Request for Proposals Document for the documents section of this bid. All clarification questions must be submitted via the portal prior to the clarification deadline. Your technical and prices submission are to be made via the portal as indicated in the RFP Document. No Physical submission of documents will be received.
Bid Protests Not Available