State Bid

Last Updated on 12 Oct 2022 at 4 AM
RFQ
Lincoln Nebraska

Construction Manager at Risk-Request for Qualifications and Proposal-UNMC Lied Transplant Center Elevator Replacement

Solicitation ID 3705-22-7200 Addendum 1
Posted Date 12 Oct 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency University Of Nebraska
Location Lincoln Nebraska United states
In order to participate you must submit your Statement of Qualifications electronically through this eBid system. No paper submissions will be accepted. The University of Nebraska Medical Center intends to procure a qualified contractor to provide pre-construction services and construction services as the Construction Manager at Risk (CMR) for the LTC Elevator Replacement project. The estimated construction cost for the CMR Guaranteed Maximum Price (GMP) is $3.4 million. (Add $1.4 million for elevator subcontractor). The total estimated construction budget including the GMP, in-house construction services, and the Owner’s contingency is $5.3 million. Please Note: There will not be a pre-submittal meeting held for this project. If access to the facility is needed, please submit a request to [email protected] prior to the deadline for submitting questions. The proposed project is to include six (4) public elevator replacements within existing hoist ways. TK Elevator to provide elevator equipment basis of design. Scope will also include machine room cooling, venting, fire protection, fire alarm provisions, lighting, and power coordination with high rise code and coordination with the Elevator Supplier.
Bid Protests Not Available

Similar Past Bids

Similar Opportunities

Winterhaven California 18 Jul 2025 at 8 PM
Winterhaven California 18 Jul 2025 at 8 PM
Oxnard California 23 Jul 2025 at 9 PM