State Bid

Last Updated on 15 Dec 2023 at 5 AM
RFQ
Washington

Construction Management Services for Rehabilitation of Theodore Roosevelt Memorial Bridge

Solicitation ID DCKA-2024-Q-0023
Posted Date 15 Dec 2023 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Ddot
Location Washington United states
The District of Columbia, Office of Contracting and Procurement, for and on behalf of the District of Columbia Department of Transportation (DDOT), pursuant to the Procurement Practices Reform Act of 2010, and the Procurement Integrity, Transparency, and Accountability Amendment Act of 2016, is issuing this Request for Qualifications (RFQ) to solicit Statements of Qualifications (SOQs) from experienced firms (Offerors) interested in providing Construction Management (CM) Services for the Rehabilitation of Theodore Roosevelt Memorial Bridge (the Project). Intended construction work for Rehabilitation of Theodore Roosevelt Memorial Bridge (TR Bridge) generally consists of the following items: staged removal and replacement of the concrete deck and structural steel, clean and painting of existing structural steel, repairing the existing bridge granite stone fa¿ade, various concrete repairs to the bridge substructure, removal and installation of roadway lighting; removal and installation of signing and sign structures, roadway replacement, removal and replacement of guardrail, latex modified overlay, substructure replacement and repairs, removal and replacement of pedestrian railing, sidewalk widening, and other work. The work will be performed over the National Park Service (NPS) Properties, Rock Creek and Potomac Parkway in the District of Columbia and George Washington Memorial Parkway in the Commonwealth of Virginia. The Contractor shall comply with the requirements of this contract and the National Park Service criteria regarding construction on this site. The Rock Creek Park Trail and Mount Vernon Trail, for pedestrians and bicycles, are located under the east and west end of the bridge and shall always remain open for use for the duration of the construction except when temporary closures, as approved by the Engineer and the National Park Service, are permitted. The George Washington Memorial Parkway and Rock Creek Parkway shall always remain open for the duration of the construction except when temporary lane closures, as approved by the Engineer and DDOT, are permitted. Work items for the construction contractor include: Mobilization and demobilization, provision and maintenance of work and storage space, providing Engineers field facilities and performance of employee training. Establishment and maintenance of temporary traffic control including signs, temporary lighting, temporary pavement markings, barricades, and other transition devices; reconfiguring the devices in conjunction with changes in work areas; and their removal and disposal of upon Project completion, including restoration of areas disturbed by temporary traffic detours to their original condition. All maintenance of traffic shall be coordinated with work being done on other projects which may be under construction in the vicinity. The desired outcome of this RFQ is to retain the services of an experienced and qualified consulting firm, that provides the best value, to perform Construction Management services, under the direction of the Contract Administrator (CA) of the DDOTs Infrastructure Project Management Administration. The selected consulting firm, hereinafter referred to as the Consultant, will be selected using the DDOTs qualifications-based process. The Project documents are located at https:// dtap.ddot.dc.gov/.
Bid Protests Not Available

Similar Past Bids

Washington 12 Apr 2024 at 4 AM
San diego California 15 Jun 2023 at 3 PM
North dakota 04 Jan 2024 at 5 AM
Medora North dakota 08 Nov 2010 at 5 PM

Similar Opportunities

Fort valley Virginia 19 Aug 2025 at 5 PM
New york 27 Jul 2025 at 4 AM (estimated)