State Bid

Last Updated on 18 Apr 2022 at 4 AM
RFP
San jose California

Construction Management Services for the Rinconada Reliability Improvement Project Phases 3-6

Solicitation ID VW0107
Posted Date 18 Apr 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Santa Clara Valley Water District
Location San jose California United states
Valley Water is seeking proposals from responsive, responsible and qualified firms to provide construction management services (CM Services) for Valley Water during construction of the Rinconada Water Treatment Plant (RWTP) Reliability Improvement Project Phases 3 – 6 (Project). The Project consists of the following: 1. Phase 3 - Clarifier Demolition; 2. Phase 4 – Ozone Generation Building, Chlorine Contact Basin, Liquid Oxygen (LOX) Facility, and Filters; 3. Phase 5 - Existing Filters Demolition, Fluoridation, Sodium Hypochlorite Facilities, Washwater Recovery Basin Demolition, and Demobilization; and 4. Phase 6 – Project Completion Project Objectives A. The objectives of the project include: 1. To improve overall plant reliability by increasing the plant capacity to 100 MGD; 2. To provide treatment process improvements that enable the plant to produce water that is in compliance with current and anticipated water quality regulations and is aesthetically pleasing; and 3. To implement the construction of a robust treatment train consisting of: (1) raw water ozonation, (2) conventional flocculation and sedimentation with plate settlers, (3) granular media filters, and (4) a post-filter chlorine contactor.
Bid Protests Not Available

Similar Past Bids

Santa clara California 01 Oct 2019 at 2 PM
Palo alto California 15 Jul 2020 at 4 AM
Palo alto California 17 Oct 2022 at 4 AM
Ohio 17 Feb 2021 at 5 AM