State Bid

Last Updated on 23 Apr 2022 at 12 PM
Mississippi

Construction Management, Inspection, and Materials Testing for Arcade Cripple Creek Trail #20-18-002

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Citrus Heights
Location Mississippi United states
The Arcade-Cripple Creek Trail Project, formerly known as the Electric Greenway Trail Project, is a 2.9 mile multi-use trail between Sunrise Boulevard and Wachtel Way largely following an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The Project is located in the city and unincorporated Orangevale, and connects several neighborhoods to seven parks, several schools, and the Sunrise MarketPlace. In addition to a paved multi-use trail, this Project also includes the following elements: A new signalized crossing at Fair Oaks Boulevard; Solar powered pedestrian-scale pathway lighting; New sidewalk, curb ramps, curb, and gutter at various locations;Drainage improvements; Pre-fabricated pedestrian bridges; Retaining walls; Signing and striping; Trail wayfinding signage; Traffic signal modifications; and Landscaping. Engineer’s Estimate: $6,700,000
Bid Protests Not Available