The work consists of furnishing all labor, materials, tools, equipment, and incidentals as require by the plans (Drawing Number 18-08A, Sheets 1-66), Specifications and Contract Documents. The general items of work include constructing roadway pavement section, sidewalks, curb and gutter, retaining walls, storm drains, catch basins and stormwater treatment areas, reconstructing curb ramps and driveways, removing trees, relocating and adjusting utilities, waterline improvements, relocating mailboxes, installing guardrail and flashing beacons, street lighting facilities, signing and striping, planting landscaping, irrigation and appurtenances, per specifications. The Project is located on Conejo School Road from US 101 Freeway to Hillcrest Drive and Willow Lane from US 101 Freeway to Hampshire Road in the City of Thousand Oaks.
Bid Protests Not Available