Point Of Contact Not Available
Bidding Instructions: UNION LABOR REQUIRED All work to be bid 2nd shift or weekends when bank is closed. Send bid proposal on company letterhead to
[email protected] This project will include 2-3 interior phases/moves of staff 5,600 SF INTERIOR RENOVATION TO AN EXISTING COMERICA BANK Division 1 General Requirements: N/A Division 2 Existing Conditions: Selective Demolition, Remove Wall Paper, Remove Wood Wall Panels Division 3 Concrete: Core Drilling Slab, Trenching, Patching Division 4 Masonry: Masonry infills Division 5 Metals: N/A Division 6 Wood and Plastics: Rough and Miscellaneous Carpentry, Sheathing, Metal Stud Framing, Millwork, Plastic Laminate, Metal Laminate, Furniture Removal (FFE), Focal Walls Division 7 Thermal and Moisture Protection: Sheet Metal and Flashing, Joint Sealants (around windows and openings), Roofing patch/seal Division 8 Doors and Windows: Doors, Frames and Hardware, Glass and Glazing (Falkbuilt System) Division 9 Finishes: Gypsum Board Assemblies, Gypsum Board Patching, Wall Prep, Carpet, Resilient Wall Base and Accessories, Luxury Vinyl Flooring, Vinyl Composite, Acoustical Ceilings, Painting, Solid Surface SS-2. Wall panel/ paper removal, Tile patch and repair Division 10 Specialties: Toilet Partitions and Accessories, Walk off Mat, Mirrors Division 11 Equipment: N/A Division 12 Furnishings: Window Blinds, Window Shade Fabric Division 15 Mechanical: Plumbing, Plumbing Fixtures, Floor grains, Roof vent, Drinking fountain, HVAC, Gas furnace, Electric unit heater, Exhaust fan, Condensing unit, Grilles, Registers, Diffusers, HVAC Controls, Mechanical equipment removal/ disposal Division 16 Electrical: Electrical Demo, LED Lighting, Lighting Controls, Lighting Removal and disposal
Bid Protests Not Available