Point Of Contact Not Available
Bidding Instructions: UNION LABOR REQUIRED All work to be bid 2nd shift or weekends when bank is closed. Send bid proposal on company letterhead to
[email protected] This project will include 2-3 interior phases/moves of staff. 2,000 SF INTERIOR RENOVATION TO EXISTING COMERICA BANK Division 1 General Requirements: N/A Division 2 Existing Conditions: Selective Demolition Division 3 Concrete: NA Division 4 Masonry: NA Division 5 Metals: N/A Division 6 Wood and Plastics: Rough and Miscellaneous Carpentry, Sheathing, Metal Stud Framing, Millwork, Plastic Laminate, Metal Laminate Division 7 Thermal and Moisture Protection: Sheet Metal and Flashing, Joint Sealants Division 8 Doors and Windows: Doors, Frames and Hardware Division 9 Finishes: Gypsum Board Assemblies, Gypsum Board Patching, Wall Prep, Carpet, Resilient Wall Base and Accessories, Luxury Vinyl Flooring, Vinyl Composite, Acoustical Ceilings, Painting Division 10 Specialties: Toilet Partitions and Accessories, Walk off Mat Division 11 Equipment: N/A Division 12 Furnishings: N/A Division 15 Mechanical: N/A Division 16 Electrical: Electrical Demo, LED Lighting, Lighting Controls
Bid Protests Not Available