Point Of Contact Not Available
Bidding Instructions: UNION LABOR REQUIRED All work to be 2nd shift or weekends when the bank is closed. Send bid proposal on company letterhead to
[email protected] This project will include 2-3 interior phases/moves of staff 4,800 SF INTERIOR RENOVATION AND DRIVE-THROUGH TO AN EXISTING COMERICA BANK Division 1 General Requirements: N/A Division 2 Existing Conditions: Selective Demolition, Remove Wall Paper, Remove Wood Wall Panels Division 3 Concrete: Core Drilling Slab Division 4 Masonry: Masonry Toothing. Masonry Demolition, Brick Infill Division 5 Metals: Steel Columns (2) in Office, Steel Handrails Division 6 Wood and Plastics: Rough and Miscellaneous Carpentry, Sheathing, Metal Stud Framing, Millwork, Plastic Laminate, Metal Laminate, Furniture Removal (FFE), Metal Stud ADA Ramp Division 7 Thermal and Moisture Protection: Sheet Metal and Flashing, Joint Sealants Division 8 Doors and Windows: Doors, Frames and Hardware Division 9 Finishes: Gypsum Board Assemblies, Gypsum Board Patching, Wall Prep, Carpet, Resilient Wall Base and Accessories, Luxury Vinyl Flooring, Vinyl Composite, Acoustical Ceilings, Painting, Solid Surface SS-2 Division 10 Specialties: Toilet Partitions and Accessories, Walk off Mat Division 11 Equipment: N/A Division 12 Furnishings: Window Blinds, Window Shade Fabric Division 15 Mechanical: N/A Division 16 Electrical: Electrical Demo, LED Lighting, Lighting Controls
Bid Protests Not Available