The purpose of this project is to prepare design documents for and build a streambank stabilization/restoration project along the Red Cedar River adjacent to the Colfax WWTP. This project will also consist of constructing an access road to the project site and modifications to a WWTP effluent pipe that discharges out of the eroding slope. The project is located approximately 3/4 of a mile west of the Village of Colfax, Wisconsin along the left descending bank of the Red Cedar River.