The Project is located on Route 47, in the City of Los Angeles from PM 0.4 to 2.0 on the Vincent Thomas Bridge (Bridge No. 53-1471). The project proposes to replace the entire bridge deck, upgrade existing barriers and railings, and replace seismic sensors. A more detailed description of the Project is contained in Appendix A. The estimated cost of this CMGC Project (in 2023 US dollars) is $628,464,000 for construction capital and $30,000 for Right of Way capital. 2 - Procurement Schedule Final Date for Receipt of Proposers Questions - 5/17/2023 SOQ Due Date for Electronic and Hardcopy Submittal - 6/01/2023 Notice of Short List - 7/07/2023 Proposer Interviews - 7/14/2023 Anticipated Ranking Determination - 7/24/2023 4.2 Quantities, Due Date, Time, and Location: One original and an electronic submittal of the SOQ shall be provided. The original shall be identified on its front cover, in the upper right-hand corner as (Original). All SOQs shall be received by 3 p.m. Pacific Time on the day specified in Section 2.- Procurement Schedule, unless modified by Addenda: Please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract. Unfortunately, the Department does not have a plan holders list of available proposers, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting an Statement of Qualification¿s. The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information.
Bid Protests Not Available