CLARENDON VTRY (43 work to be performed:VTR BRIDGE 96 – OVER UNNAMED STREAM, MILE POST 50.49. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES REPAIR EXISTING OPEN DECK STEEL THROUGH PLATE GIRDER, REPLACE BEARINGS, LOCALIZED CLEANING AND PAINTING AND MINOR SUBSTRUCTURE REPAIRS. CLARENDON VTRY (44)work to be performed: VTR BRIDGE 98 – OVER UNNAMED STREAM, MILE POST 51.26. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES REPAIR EXISTING OPEN DECK STEEL THROUGH PLATE GIRDER, REPLACE BEARINGS, LOCALIZED CLEANING AND PAINTING AND MINOR SUBSTRUCTURE REPAIRS. Engineers Category B
Bid Protests Not Available