The Department will retain an engineering firm to provide a supplementary construction inspection staff of approximately six (6) inspectors, under the Department's Inspector(s)-in-Charge for construction inspection and documentation services on the following projects: ECMS 87757, SR 79-L10: For the milling and resurfacing of asphalt pavement, bridge rehabilitation, base repairs, guide rail, end treatments, signs, pavement markings, drainage, rest area improvements, and other miscellaneous construction, all within a length of 28,573.64 linear feet (5.41 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0079, SECTION L10, in LAWRENCE COUNTY, PLAIN GROVE TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From approximately the Butler/Lawrence County line at Segments 1050/1051 Offsets 0000/0000 (Station 0+00) to approximately the Lawrence/Mercer County Line at Segments 1100/1101 Offsets 1887/1928 (Stations 283+41/284+84). ANTP date: May 8, 2023 Anticipated Completion Date: July 22, 2024 ECMS 109284, SR 376-L08: Mill and Inlay and bridge preservation on I-376 from SR 224 to Turnpike in Union Township, Lawrence County. Bridge work will include spall repair, asphalt patches and joint repair. This project being situated as follows: From the State Street (SR 0224) overpass at Segment 0134 Offset 0000 eastbound and Segment 0135 Offset 0000 westbound to Toll 376 at Segment 0144 Offset 3765 eastbound and Segment 0145 Offset 3477 westbound. ANTP date: August 28, 2023 Anticipated Completion Date: December 13, 2024
Bid Protests Not Available