The Department will retain an engineering firm to provide a supplementary construction inspection staff of approximately six (6) inspectors, under the Department's Inspector(s)-in-Charge for construction inspection and documentation services on the following project: ECMS 97934, SR 65 A56 - Milling and paving of bituminous surface, guide rail updates, drainage upgrades, inlet adjustments, base repairs as needed, ADA curb ramps improvements, signal updates, bridge preservation and other miscellaneous construction, all as indicated on the drawings approved for State Route 65 , Section A 56, in Allegheny County, Glenfield, Haysville, Glen Osborne and Sewickley Boroughs from approximately 2000 LF North of the intersection of the Neville Island Bridge at segment 0160/0151 offset 1509/1539 to approximately 200 LF North of the intersection of the Sewickley Bridge at segment 0200/0201 offset 1328/1349. Two structures within limits no work needed 02-0065-0180-0000 and 02 0065 0190-0030. ANTP date: March 29, 2021 Anticipated Completion Date: December 15, 2021
Bid Protests Not Available