Reconstruct northbound and southbound I-95 (four lanes in each direction) from just north of Margaret Street to Kennedy Street. The viaduct that carries I-95 over Tacony Street and Bridge Street will be replaced; Removal of the Bridge Street northbound on-ramp and the James Street southbound off-ramp; Reconstruct Tacony Street from Buckius Street to Kennedy Street; Modify the traffic signals at Bridge and Tacony Streets, and Bridge and James Streets; reconstruct Bridge Street to reduce the street width and add pedestrian and bicyclist safety features, and construct stormwater outfall(s) to Old Frankford Creek.
Bid Protests Not Available