State Bid

Last Updated on 11 Apr 2023 at 10 PM
RFA
Washington

Chehalis River Surface Water Intake, Transmission Main, and Adna WTP

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Office Of Minority And Women's Business Enterprises
Location Washington United states
Point Of Contact Not Available
The work associated with the construction of the Chehalis River Surface Water Intake, Transmission Main, and Adna WTP provides for the following two Schedules: Schedule A: Chehalis River Surface Water Intake, Transmission Main – Construct gravel access road, intake system, electrical platform, raw water transmission main (Additive A-1) and finished water transmission main (Additive A-2). Schedule B: Adna WTP – Construct prefabricated metal building, concrete reservoir, pumps, piping, valves, and appurtenance, site electrical, HVAC, telemetry and controls, and site grading. Remove and reinstall existing membrane equipment in proposed Adna WTP building. Closing Date: Thursday, May 4, 2023 Organization: Boistfort Valley Water Point of Contact: Michael B. Johnson, Gray & Osborne, Inc., [email protected], (206) 284-0860
Bid Protests Not Available

Similar Past Bids

Washington Not Specified
Washington Not Specified
Washington Not Specified
Washington Not Specified

Similar Opportunities

Georgia 22 Jul 2025 at 7 PM
Mansfield Massachusetts 09 Jul 2025 at 7 AM (estimated)
Point reyes station California 10 Jul 2025 at 9 PM
Oklahoma 09 Jul 2025 at 4 AM (estimated)