City of Lake Charles, Louisiana Wastewater Treatment Plant A Basin A-05 Rehabilitation Capital Project No. 3423 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. There is approximately 18,500 LF of 6-inch through 12-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.