Answer 1:
LINE ITEM 0001, No, the shade fabric tops are not included, and in good shape. Price should include cost for removal/re-install shade fabric tops and to be stored in a Government facility during removal of old canopy frames and installation of new canopy farmes. The contractor shall re-install the shade fabric tops upon completion of the installation of the canopy frame structures.
Question 2:
LINE ITEM 0002, Does the removal of the existing canopy frame structures include the removal and disposal of concrete footings?
Answer 2:
LINE ITEM 0002, Price should include removal and disposal of concrete footings.
Site Visit:
I am available for site visit 0900-1100 hours or 1300-1500 hours, M-F. Please call me 24 hours prior to for coordination. Last day for site visit, Friday 5 Aug 2011.