Federal Bid

Last Updated on 28 Mar 2011 at 8 AM
Combined Synopsis/Solicitation
Location Unknown

CADE2 DB2 Initialization

Solicitation ID TIRNO-11-R-00011(1)
Posted Date 17 Feb 2011 at 6 PM
Archive Date 28 Mar 2011 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office National Office Procurement (Os:Pr:P)
Agency Department Of Treasury The
Location United states
Based on the following questions the solicitation has been amended: 1. Section B: Do the hours indicated in the table represent the total support IRS expects the contractor to bid? Since this is a FFP bid, it is unusual for IRS to dictate the level of support. No, Contractors are encouraged to propose labor categories that will best meet the needs of the requirement. 2. Section C 10.0 Inspection and Acceptance. The referenced Quality Assurance Surveillance Plan Table 2.0 is not provided. Per Section 11.0 below, it is understood that the contractor will provide this table. The Solicitation under this section has been amended. “Table 2.0” is removed, it is understood that the contractor will provide a table. 3. Section C 11.0 Quality Assurance Surveillance Plan. Does IRS intend for the QASP to be included with this proposal, or will the QASP be prepared during performance? Yes, the IRS does intend for the QASP to be included with this proposal. 4. Section C 12.0 Quality Control Plan. This Plan is not included in the deliverables table in Section 6.0. This is not a deliverable, but needs to be made available upon the request of Government. 5. Section J Section 508 Conformance refers to a Secure Registration Based Email (SRBE). Is this correct? No, this is not correct and has been removed. 6. Section L 1.1 Delivery of Proposals indicates that “All proposals shall be submitted via one electronic copy” while 2.1 Submission Requirements asks for “an original hardcopy and an electronic submission.” Please clarify. The submission of proposals and all necessary documents should be electronic copies only. This section has been amended as such. 7. Section L 2.1 Submission Requirements -- How many past performance references are required / permitted? The submission of past performance reference forms should be submitted with proposals and 2 references are required. 8. Section L 3.1 Section 1: Technical Proposal Content and Section M Factor 1 Subfactor (a) item (d) and (e) refer to a “secure FIPS 140-2 compliant Email systems”. Is this correct? No this is not correct and has been removed.
Bid Protests Not Available

Similar Past Bids

Location Unknown 22 Mar 2006 at 5 AM
Maryland Not Specified
Maryland Not Specified
Maryland Not Specified