Federal Bid

Last Updated on 23 Oct 2024 at 11 PM
Solicitation
California

CA FTNP SEKI 13(2) Mineral King Road

Solicitation ID 6982AF24B000017
Posted Date 23 Oct 2024 at 11 PM
Archive Date 21 Nov 2024 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office 6982af Central Federal Lands Divisi
Agency Department Of Transportation
Location California United states

THIS IS AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE AVAILABLE

 
Full and Open Competition with HUBZone price preference 


PROJECT NUMBER: CA FTNP SEKI 13(2) 
PROJECT NAME: MINERAL KING ROAD 
PROJECT DESCRIPTION: 
The project proposes to rehabilitate up to 12.09 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA. 
SCOPE OF THE WORK: 
The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. 

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service. 


PRINCIPAL WORK ITEMS: 
22,500 LF Ditch Excavation 
1,900 CY Rip Rap 
700 CY Special Rock Embankment 

6,500 Tons Roadway Aggregate, Method 2 
7.5 Miles Full Depth Reclamation, Method 2 
4.5 Miles Full Depth Reclamation, Method 2 with Cement 
26,000 Tons Asphalt Pavement 
380 LF Steel H Piles, In Place 
9,800 LF 24" to 48" Culverts 
70 Each Inlet (Concrete Box Inlet) 
37,000 LF Paved Ditch, Asphalt 
80 Each Dry Stacked Headwall 

ANTICIPATED SCHEDULE: 
Preshow Onsite Meeting - October 2024 
Advertisement - October 2024 
Construction - April 2025 through October 2027 

Estimated Cost Range:  $25M to $35M

Bid Protests Not Available

Similar Past Bids

California 02 Oct 2024 at 3 PM
California 21 Oct 2024 at 4 PM
California 04 Nov 2024 at 10 PM
California 25 Oct 2024 at 8 PM
California 25 Oct 2024 at 9 PM