To comply with Regional, State and Federal water quality standards, Burbank Water and Power (BWP) is proposing to construct onsite storm water improvements, as well as improvements to the adjacent off-site storm water drainage system. The project will divert storm water that is generated offsite by constructing a new storm water pipeline, manholes, and connection to the Burbank Western Channel. Onsite drainage improvements would consist of diverting flow from an existing 36-inch diameter pipe into an on-site filter, then into an underground vault within the northeast portion of the BWP Campus. The treated storm water would either be used for cooling tower make-up water or infiltrated into the ground, or a combination of the two all in compliance with the City's Bid Schedule No. 1504.