The project includes furnishing all labor, materials, services and equipment; performing all work necessary as specified for, but not limited to, street rehabilitation along an existing 4-lane divided arterial with median islands and left turn pockets. The work includes grinding/cold planning, full depth removal of AC pavement and replacing in areas of severe structural failure, adjusting utility boxes and manhole lids to grade, constructing ADA curb ramp improvements, installing detector loops and striping to match the existing of Bullard Avenue
Bid Protests Not Available