The project scope includes: -Asphalt deep patch mill sections of road experiencing asphalt failures. Deep patch milled areas will be filled with 4¿ of 25 mm Superpave Asphalt. -Milling and repaving the entire road length to be flush with the existing gutter line. -Replacing damaged sections of sidewalk, curb, gutter, and driveway aprons as identified on the construction plans. -Thermoplastic stop bar striping and crosswalk striping at subdivision egress. -Sod disturbed areas.