The project consists of construction of a new Control Room on the top of the existing Dam structure. The work generally includes construction of steel-stud walls with ballistic sheathing, wood truss roof structure w/ metal roofing, installation of HVAC equipment, receptacles, interior and exterior lighting, and data cabling for the new control room. The project is located approximately 6 miles south of Toston, Montana at the end of Toston Dam Road. The project is owned and operated by the DNRC. The Montana DNRC will hold a Pre-Bid Conference at the Broadwater Dam site starting at 11:00 AM local time on February 13, 2020. Bidders having questions or requiring clarification or interpretation of any section within this event must address these issues in writing utilizing the eMACS Q & A Board of this solicitation by the deadline stated, with responses posted to eMACS no later than February 26, 2020. Questions received after the deadline may not be considered.
Bid Protests Not Available