State Bid

Last Updated on 12 Mar 2020 at 4 AM
Bridgeton Missouri

BRIDGEPORT PLACE DRIVE STORM WATER IMPROVEMENT PROJECT

Solicitation ID 13
Posted Date 12 Mar 2020 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Bridgeton Mo
Location Bridgeton Missouri United states
Please be advised, the City of Bridgeton, Missouri will receive sealed bids for the Bridgeport Place Drive Storm Water Improvement Project until 10:00 a.m. (Central Time) on TUESDAY, March 31, 2020 (“Closing Time”) at the Bridgeton Government Center, 12355 Natural Bridge Road, Bridgeton, Missouri 63044, at which time and place all bids will be publicly opened and read aloud. Project – The project will consist of the installation of 2 storm water area inlets, the installation of 147 LF of 12” PVCP, the removal of trees, the removal and replacement of various fencing, grading, and site restoration. Additional items and estimated quantities are inclusive in the Bid Proposal and Drawings. Contractor shall complete all work within 45 working days from the Notice to Proceed. Bid packages will be available beginning March 16, 2020, from the Bridgeton Government Center, 12355 Natural Bridge Road, Bridgeton, Missouri 63044 for a cost of $25.00 per set. Questions regarding this project should be directed to Robert E. Gunn P.E., Director of Public Works, at (314) 739-7665. Each Bid must be accompanied by a cashier’s check or certified check, or a Bid Bond executed by the bidder and an approved Surety Company, and payable to the City in an amount not less than five percent (5%) of the sum total of the bid. Not less than the prevailing hourly rates of wages as found by the Department of Labor and Industrial Relations of the State of Missouri, or determined by court on appeal, shall be paid to all workmen performing work under this Contract and Contractor will indemnify and hold the City harmless therefore. The City reserves the right to reject any and all bids, and to waive all informalities in Bids. No Bid may be withdrawn for a period of sixty (60) days, subsequent to the specified time for receipt of Bids. No low bidder shall have a business expectancy merely because his bid is the lowest one received; until the contract has been awarded, no business expectancy exists. Bids may be withdrawn solely for demonstrated and verifiable clerical or typographical mistake, but not mistake of judgment. Bids will be considered unresponsive if they contain any material defect or deviation. The City reserves the right and sole discretion to reject any and all bids. Robert E. Gunn P.E., Director of Public Works Brian Petersen, Assistant City Engineer
Bid Protests Not Available

Similar Past Bids

Bridgeton Missouri 31 Mar 2021 at 4 PM
Bridgeton Missouri 14 Aug 2020 at 3 PM
Bridgeton Missouri 05 Mar 2020 at 5 AM
Colorado Not Specified
Bridgeport California 15 Aug 2020 at 12 AM

Similar Opportunities

Washington 27 Jul 2025 at 5 PM (estimated)
Kittery Maine 11 Jul 2025 at 8 PM
Rock island Illinois 20 Jul 2025 at 3 PM