This project involves the replacement of an existing sewer main on Bowron Road, and a connecting sewer line within 13250 Civic Center Drive. Approximately 1,385 LF of 18- inch vitrified clay pipes (VCP) are to be upsized to 21-inch polyvinylchloride (PVC) pipe, and approximately 113 LF of 8-inch PVC pipe are to be replaced. The project will also include sewer bypassing, dewatering, sewer manhole installation, sewer manhole rehabilitation, and traffic control.
Bid Protests Not Available