Correction due ot late posting date.
New Solicitation Date: 6/5/2023
New Closing Date/Time: 7/3/2023 at 2:30 PM (Pacific)
Presolicitation: 17 May 2023 to 1 June 2023
Amendment 001: Posted 05/30/2023. Note for Prebid Tour Date, Time, and Location:
June 8th at 1:00 Central Time meet in the parking lot of the Bessey Ranger District Office (in front of the park area).
Address:
40637 River Loop Rd
Halsey, NE 69142
Formal Advertisment: 1 to 30 June 2023 (Closing on 6/30/23)
STATEMENT OF WORK:
SCOPE OF CONTRACT:
This contract consists of removing fence damaged by the Bovee wildfire by pulling any remaining post, picking post up that are on the ground, rolling up wire, and removing all the damaged material off the forest to be disposed of properly. This contract also consists of construction of new fence exactly where the old fence was and to the specifications in the attached “Fence Specification” document.
PROJECT LOCATION:
This projected is within in the boundaries of the Bovee Fire area on the Bessey National Forest. There is approximately 16 miles of fence that needs to be removed and rebuilt. This project is broken down into priority areas as shown in the attached map. The attached map is for reference only and the number of feet may not be exact. The fence will be rebuilt exactly where the old fence was. This project area contains limited access areas. In these areas the Contractor shall select a method of travel (motorized, foot, etc..) in meeting the contract specifications.