Contractor shall remove and dispose of existing Gas fired boiler located on Floor 8 of Dam Structure. Contractor shall furnish and install replacement boiler, and Cooling unit to include any and all required setup, assembly, clean up and disposal and disclosure of all warranties at Sutton Dam, Sutton Lake, Sutton, WV in accordance with attached solictation.