The objective of the Project is to renovate the Bishop Park Pool facility to extend the life and usefulness of the facility located at 705 Sunset Ave, Athens, GA. Renovation will not require hazardous material abatement prior to any construction activities. Materials at the building site have tested and identified no hazardous material. The Hazardous Material Report is included in the RFP documents. The demolition phase requires selective removal of plumbing, mechanical, electrical, flooring, and non-load bearing walls, existing buildings, concrete decking, and pool. The construction phase will require the installation of but not limited to new plumbing, mechanical, electrical, pool related chemical feed systems, ADA access ramps, interior/exterior building renovations, new pump house, retaining walls, pool commissioning & start-up, perimeter fencing, and site work. Special care shall be considered during this project because the construction area is located in a public park that will remain open during construction.
Bid Protests Not Available