PROJECT DESCRIPTIONThis project consists of the reconstruction of a campground and day use area as follows:
Base Items - removal and disposal of existing toilet buildings, excavation, embankment, road reconditioning, crushed aggregate placement, trail construction, construction of campsite living areas and parking spurs, waterline construction, information kiosks, and signage.
Option Items -
Include construction of a picnic shelter structure, Bayview North Group Campsite reconstruction, removal and disposal of a toilet building and additional surface rock placement.
PROJECT LOCATIONThis project is located in Whatcom County near Baker Lake, WA (T37N - R9E - Sec. 19). From I-5 at Burlington, WA, take Hwy 20 (exit 230) East for approximately 24 miles. Turn left and travel north on the Baker Lake Hwy for approximately15 miles to the intersection of Forest Service Road (FSR)1118. Turn right and travel south for 1 mile to FSR 1118011 on the left and the beginning of the project.
CONTRACT TYPEFixed Price Construction Project
DESIRED START DATE
June 22, 2015
PERIOD OF PERFORMANCEOne Hundred Twenty (120) Calendar Days
BONDING REQUIREMENTS
Bid Bond, Payment Bond and Performance Bond will be required
MAGNITUDE OF CONSTRUCTION PROJECT
Between $500,000.00 and $1,000,000.00
TECHNICAL POINT OF CONTACT
Luke Silvis, PE, (360) 854-2624, [email protected]
CONTRACTING POINT OF CONTACT
Brian A. Johnson, CO, (425) 783-6056, [email protected]
DRAWINGS / SPECIFICATIONS
Will be provided when the formal solicitation is issued on FBO in approximately two or more weeks.
Bid Protests Not Available