Last Updated on 22 Oct 2020 at 4 AM
Barneveld Wisconsin

Barneveld WWTF Upgrades

Solicitation ID Not Specified
Posted Date 22 Oct 2020 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Village Of Barneveld
Location Barneveld Wisconsin United states
The work for which bids are asked includes, but are not limited to, the following: the construction of a Screening Building, which will house a vertical fine screen in an 8-ft diameter precast concrete manhole; construction of a cast-in-place concrete flow monitoring structure, which will house a Parshall flume; permanent emergency generator; well pumping upgrades; plumbing work; HVAC work; electrical work; grating, walkways, handrails, and miscellaneous metals; new and modified yard piping and manholes; site work including dewatering, grading, and access driveway; turf restoration and erosion control. The anticipated substantial completion date is September 25, 2021 and final completion date is October 29, 2021. Planholders list will be updated interactively on our web address at http://www.msa-ps.com under Bidding. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Matt Castillo, P.E., 1702 Pankratz Street, Madison, WI 53704. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdraw within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at http://www.wdol.gov/dba.aspx#0. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women’s Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the “Use of American Iron and Steel” provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at http://water.epa.gov/grants_funding/aisrequirement.cfm. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village of Barneveld.
Bid Protests Not Available

Similar Past Bids

Barneveld Wisconsin 10 Jan 2020 at 5 AM
Barneveld Wisconsin 10 Feb 2020 at 5 AM
Barneveld Wisconsin 12 Jul 2021 at 4 AM
Wisconsin 05 Mar 2013 at 5 AM