The kitchen in the Base Chapel in Building 58 on Cannon Air Force Base (CAFB) is in need of renovation in order to be compliant with National Fire Protection Association (NFPA) 70, article 110.26 (1) & (2). The scope of the work includes a renovation of the Chapel kitchen to increase the overall area. Work includes asbestos abatement as well as the demolition and disposal of the following: existing ceilings, tile, cabinetry, HVAC equipment, and a select non-load bearing wall. Walls shall be patched appropriately and painted, new cabinetry shall be installed, and new ceiling grid and tile shall be installed throughout.