Point Of Contact Not Available
The pavement rehabilitation project consists in removing 6.75-Inches of the existing Asphalt Concrete (AC) pavement and base material by milling. Rebuild the 6.75-Inches of AC as specified on the proposed pavement structural section included on the construction plans. The project includes improvements to water services, sidewalk, ramps, curb and gutter, and storm drainage facilities at various locations specified on the construction plans.
Bid Protests Not Available