The purposes of this project are to prevent the contamination of water, the uncontrolled flow of water from wells, and to prevent inter-aquifer flow of water through well bores. The purpose shall be met by permanently abandoning wells through the District's Abandoned Artesian Well Plugging Cooperative Cost Sharing Program.
Bid Protests Not Available