State Bid

Last Updated on 25 Mar 2021 at 4 AM
RFB
Kentucky

Area Rae System

Solicitation ID RFB - 758 - 2100000544
Posted Date 25 Mar 2021 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Office Of The Controller
Location Kentucky United states
1. AREA RAE PRO RDK KIT - CSA or APPROVED EQUAL Shall have the following or similar component specifications: Item W01R-111101-7-569GH-0011: AreaRaePro RDK Kit Configurations of 4 Area RAE Pros configured with: ISM 900MHz, WIFI, Mesh, PID ppb, LEL, O2, CO, H2S, HCN, NH3, Gamma & RaeMet sensors RDK Kit to contain: . 1 Pelican Case . 1 Power adapter . 1 Power cord . 1 to 5 charging cable . 4 external battery chargers . 4 additional rechargeable batteries . PC communication cable . Calibration adapter . 2 screw drivers . 1 tool kit for PID sensor . 1 opening tool kit for PID . 1 lamp cleaning kit . 4 external replacement filters . 1 SensorRae 4R+ CD with Documentation . 1 RDK accessory list . ProRae Studio II software . RAELink 3 . ProRAE Guardian Licenses . Calibration and Test Certificate . Warranty Card . MUST BE Compatible with Existing Area Rae Software . 1 complimentary Training session 1 each - Item AS1-R7-81248: Quad Gas Mix: 18% O2, 50% LEL Methane, 50 ppm CO, 10 ppm H2S, Balance N2 Contained in a 116L reusable cylinder 1 each - Item AS1-R1-9A084: Calibration Gas: 100 ppm Isobutylene, Balance air contained in a 105L cylinder. 4 year shelf life. 1 each - Item AS1-RS-97098: Calibration Gas: 10 ppm HCN, Balance Nitrogen contained in a 116L Reusable Cylinder 1 each - Item AS1-RS-98098: Calibration Gas: 50 ppm Ammonia (NH3), Balance Nitrogen contained in a 116L Reusable Cylinder. 4 each - AS1-DFR-2004: Demand Flow Regulator (2004) for use w/ Reactive Gases 4 each - 500-0141-000: Power adapter, AC/DC/90-264V Input, 12VDC/7.5A 90W Output (Requires power cord PN: 410-0036-000) 4 each - 410-0036-000: Power cord for AutoRAE2 Controller without AC Adapter (Power Cord AC 125V 10A US Plug 1.8M) DELIVERY TO BE INCLUDED IN BID OFFER Bidders Who Propose Bidders who propose alternate brands/specifications should enclose descriptive literature with their bids so that the equality can be verified. Failure to enclose sufficient literature may result in a non-responsive bid. If the brands are not changed, the contract will be written accordingly and the successful bidder shall be required to deliver the brands/specifications stated in the solicitation.
Bid Protests Not Available

Similar Past Bids

Kentucky 25 Mar 2021 at 4 AM
Fort carson Colorado 14 Aug 2018 at 5 PM
Aurora Colorado 11 Jul 2011 at 10 PM
Puget sound Washington 25 Feb 2016 at 9 PM
Mission South dakota 25 Sep 2018 at 2 PM

Similar Opportunities

Frederick Maryland 15 Jul 2025 at 3 PM
Hampton Virginia 09 Jul 2025 at 12 PM
New orleans Louisiana 08 Jul 2025 at 4 AM
New york New york 09 Jul 2025 at 3 PM