Work consists of replacement of the front gates including operators, camera and gate reader improvements, and drainage improvements at the WTP. This project will replace the front gates including motor operators and loop detectors, install new network and power connections from the WTP building via directionally drilled conduit; work includes camera and site access control replacement with associated site restoration and drainage improvements.
Bid Protests Not Available