The principal items of work and approximate quantities are Mobilization and Demobilization, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Sealing Mine Entries – Twelve-Inch (12”) PVC Pipe, 80 L.F. Grading, 2,500 C.Y. Trench Excavation, 450 C.Y. Twelve-Inch (12”) PVC Pipe – PVC Pipe, 470 L.F. Subsurface Drain – Twelve-Inch (12”) PVC Pipe, 135 L.F. Smooth Interior Corrugated Polyethylene Pipe, 190 L.F. Channel Excavation, 150 C.Y. Seeding, 1 L.S. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Bid Protests Not Available