Hollars Hill South AML - Cranberry Creek Gateway Project. The principal items of work and approximate quantities are: Eight Inch (8”) Ductile Iron Pipe Including Fittings – 1,015 L.F.; Connection to Existing Water Main – 1 L.S.; Drilling of Boreholes – 448 L.F.; Furnishing and Installing Casing Pipe – 285 L.F.; Fill Material Injection – Flowable Fill Material/Concrete Material – 200/200 C.Y.; Removal and Disposal of Structures – 7; Grading, Hauling and Compaction -742,666 C.Y.; Disposal of Solid Waste –10,000 Tons; Drainage Excavation – 2,645 C.Y.; Rock Lining – 4,099 S.Y.; Seeding – 66 ACRE. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.