The principal items of work and approximate quantities are: Mobilization and Demobilization 1 Lump Sum Six-Inch (6”) Air Rotary Drilling 1,160 L.F. Confirmation Drilling (A) Overburden Drilling 75 L.F. (B) P-Series Wire Line Drilling and Core Sampling 145 L.F. Furnishing and Installing Overburden Casing 480 L.F. Supply, Delivery, Mixing and Injection of Grout (A) Cement 332 TON (B) Fly Ash (Type F) 530 TON (C) Mineral CSA 0 TON (D) Sand (Type A) 75 TON (E) Gravel (AASHTO No. 8) 0 TON (F) Sodium Bentonite Powder, 50-lb bag 400 EACH (G) Diutan Gum Powder, 50-lb bag 7 EACH (H) Super Plasticizer, 55-gal drum 12 EACH Preparation, Disassembly and Relocation of Injection System 55 EACH Monitoring Well Installation (A) 2” Diameter Monitoring Well, Installed 100 L.F. (B) Monitoring Well Manhole and Surface Restoration 4 EACH Sealing Boreholes 1 EACH Site Restoration Job Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Bid Protests Not Available