Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Trench Excavation 400 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter PVC SDR-35 Pipe, 450 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 400 C.Y. Segmented Retaining Wall with Geogrid Reinforcement, 400 S.F. Patio Replacement, 20 S.Y. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Bid Protests Not Available