The project consists of: 6,710 SY 4” & 6” Concrete, 6,960 LF Traffic Striping, 530 LF Concrete Retaining Wall, 530 LF Aluminum Handrail, 362 LF Type T Guardrail, Pedestrian Park with Landscaping, 3 Flagpoles, Benches, Waste Receptacles, and a Park Lighting System with 22 Luminaires. Funding sources for this project include: Georgia Department of Transportation TE Funds PI No. 0010213 Contact David Palmer at (229) 349-0166 or Paula Martin at (229) 928-4411 Ext. 244 to receive a full copy of the Invitation for Bids.
Bid Protests Not Available