The Work consists of supplying labor, materials & equipment as required for pavement rehabilitation on Almaden Expressway from Blossom Hill Road to Harry Road. It covers: Traffic Control System; Stormwater Pollution Prevention Plan (SWPPP); Mobilization; Potholing; Remove Existing Portland Cement Concrete (PCC); Roadway Excavation for Pavement Repair; Cold Plane Asphalt Conform; Cold In-Place Pavement Recycling (CIR); Paving Interlayer Reinforcing Grid; Hot Mix Asphalt (HMA) for Repair & Overlay; PCC Curb & Gutter/Sidewalk/Driveway Approach/ Pedestrian Ramps; Adjust Existing Manhole/Monument/Water Valves/Detector Handholes to CIR & New Grade; Roadside Sign; Thermoplastic Pavement Stripe/Marking; Painted Curb; Furnish & Install Temporary Video Detection System; Adjust Existing Electrical Pullbox to Grade; Inductive Loop System; Alpha Battery Backup Cabinet System
Bid Protests Not Available