**********************************************************
A site visit was held on 27 Sep 11, the following notification is a result of a question posed at that site visit:
The dryer is run on a 120 Volt line, but we can tap into the 460V 3-Phase Master Panel, if needed.
**********************************************************
Bid Protests Not Available