Point Of Contact Not Available
Replacement of the existing chilled water plant equipment, including (1) chiller, and two (2) chilled water pumps. This work shall be completed prior to work on hot water system. Replacement of the existing hot water plant, including two (2) existing boilers, (2) primary hot water pumps, and (2) secondary hot water pumps
Bid Protests Not Available