The Government requirement commercial services to support the expansion of one of Arnold Engineering Development Complex’s test capabilities. There are two main tasks associated with this test capability expansion requirement:
1. Reactivation of a large industrial-grade heater to work alongside the existing heater, enabling the delivery of elevated temperatures to the process air system for the test cell.
2. Installation of ducting, valves, and hydraulic skids to channel the heated air from the heaters to the test cell. This system will include a duct leg configuration to ensure stable conditions with the test cell and incorporate necessary controls, pressure, and flow valves to regulate process air parameters.