Addendum #2 Addendum #1 Notice Summary The scope of work for this contract includes: Traffic Signal Modifications Actuated flashing beacon installation including drilled shaft and signal support structure Temporary and permanent pedestrian and traffic control. Construction of concrete sidewalk and sidewalk ramps. Engineer's Estimate: $1,000,000 - $1,200,000
Bid Protests Not Available