This is an amendment to revise PRDA 03-01-MLK. Section A, Paragraph 4d is hereby replaced as follows: Base Support: Base support will be provided during the performance of the contract. A copy of a listing of same is available upon e-mail request to the Contracting POC, e-mail address provided above. Proposers desiring a site tour should contact the technical POC no later than 3 January 2003. Any such tour shall be offered if requested on a one-time basis on 7 January 2003 at 10:00 a.m. The site tour is expected to last approximately one-two hours. No more than two persons shall represent a single company, and these representatives must be identified on the request for site visit. No other tours shall be conducted. Those desiring a tour shall note that given the security on base, you will need to arrange with the technical POC to be signed in at the Area B visitor center prior to proceeding to the lobby of Building 653, where you will be signed into the ML complex. Thereafter a short introduction / presentation in Building 655 Room 147 shall be given followed by a tour of the appropriate facilities. The Air Force is not responsible for any proposal impact due to the failure to adhere or comply with the above. Direct questions to the Contracting point of contact identified in the announcement.
Bid Protests Not Available