The Work to be performed shall include: Stormwater detention pond improvements, including but not limited to dredging of sediment, installation of a new control structure manhole, installation of a new access driveway, site restoration, and other work necessary to complete the project. Engineer’s Estimate for this work is $375,000 to $425,000. Bid Submittal. Click on the link to submit your bid. Download the "City of Redmond DocuSign bid Submission Instructions (PDF)" PDF for instructions on submitting your bid. Join Live Event. Click on the link to join the bid opening. Download the "Bid Opening via Live Event Instructions" PDF for instructions on joining the event.
Bid Protests Not Available