Change the following equipment FROM:one combination 4â by 8â quarter pipe next to a 5â by 12â quarter pipe;
one combination 3â launch box next to a 4â launch box;
one combination 4â by 12â quarter pipe next to a 5â by 8â quarter pipe;
TO:
one combination 4â by 12â quarter pipe next to a 5â by 12â quarter pipe;
two combination 3â launch boxes next to a 4â launch box;
one combination 4â by 12â quarter pipe next to a 5â by 12â quarter pipe;
Add the following:
Additional Salient Characteristics and specifications:
All equipment must meet applicable safety standards and guidelines, including but not limited to, appropriate backstops. Any steel used must be protected from rust with a durable powder coating or equivalent protective surface. SkateLite is considered an equal. Wood ramps or any other material less durable than either steel or SkateLite is not acceptable.
Change the following FROM:
The price must include delivery and on-site installation to provide a ready-to-use skate park.
TO:
The price must include delivery and on-site installation to provide a ready-to-use skate park, within 60 days of the date of award.
The proposal due date is extended to 24 September 2003, no later than 4:00 p.m. MST.
Bid Protests Not Available